skip to Main Content

Site fabrication

On-site fabrications are required whenever a trench is to form a corner or junction. All half metre polymer concrete channels have drill-out details on the side to aid the formation of corners and T junctions but all channels can be cut and fabricated to create the desired layout.

ACO strongly recommends wet cutting, wet drilling and/or wet grinding of polymer concrete products in a well ventilated area with the use of personal protective equipment (including masks).

T junctions

T junctions are when an opening is cut into the side of one channel and another channel is butted up to this opening.

Site Fabrication
 Popular Searches  Hide Popular Searches
Back To Top